Dining Chairs · Current collection

Mogan Dining Chair

Open-back armchair with a floating backrest.

  • With armrests
Minimum order
100 pcs, colours can be mixed
Lead time
35 days production
Shown in
Light grey fabric, black steel base
Request price & samples

About the Mogan

Mogan separates the backrest from the seat with an open gap, so the back appears to float above curved armrests. The opening keeps the chair visually light around a table.

Shown in light grey fabric on a black four-star steel base. Other fabrics, colours and base finishes are available to order.

Highlights

  • Open gap between seat and backrest
  • Curved armrests
  • Four-star steel base
  • Fabric and base finish to order

Specifications

Model
Mogan
Upholstery
Woven fabric
Frame / base
Steel four-star base, powder coated
Shown in
Light grey fabric, black steel base

Dimensions, packing and loading data for this model are confirmed with your quotation.

Made to order

Your fabric, your finish, your label.

  • Fabric & colour

    Velvets, chenilles, linens, technical fabrics, genuine leather and PU leather from our library — or send your own roll.

  • Base & finish

    Powder-coat colour and finish on steel bases; wooden bases where the design allows.

  • Seat & stitching

    Seat build, piping, stitch pattern and contrast details are adjusted at sampling stage.

  • Packaging & labels

    Your carton artwork, shipping marks and barcode labels, with a pre-production carton sample for approval.

Order terms

Minimum order
100 pcs per model, colours mixed
Small batches
Olleo Flex: from 4–6 pcs, about 15 days
Production
35 days from deposit and approvals
New samples
2–4 weeks
Trade terms
FOB Ningbo / Shanghai; EXW, CFR, CIF on request
Standards
Engineered against EN 12520; EN 16139 reviewed for contract projects
Quotation
Within 24 hours

How OEM / ODM works

Mogan: questions & answers

What is the minimum order for the Mogan Dining Chair?

The minimum order is 100 pieces of the Mogan, and colours and fabrics can be mixed within that quantity. To test the model first, Olleo Flex produces from 4–6 pieces in about 15 days.

Can the Mogan be made in a different fabric or colour?

Yes. The Mogan is made to order: choose a fabric from the Olleo library, or send your own. Base finish and packaging can also be specified.

How long is the lead time for the Mogan?

Production takes 35 days from deposit and final approvals. Goods ship FOB Ningbo or Shanghai; EXW, CFR, CIF terms are also available.

Request a quote

Price, samples and loading plan for the Mogan.

Tell us your quantity and destination port. We reply within 24 hours with pricing, carton sizes and a production schedule.

Reply within 24 hours

WhatsApp