Dining Chairs · Current collection
Manchester Dining Chair
Low-back tub chair with stitched panels.
- With armrests
- Size (W × D × H)
- 62 × 63 × 84 cm
- Packing
- 2 per carton · 540 pcs per 40HQ
- Minimum order
- 100 pcs, colours can be mixed
- Lead time
- 35 days production
- Shown in
- Taupe vintage-look fabric, black steel base
Ask about this model on WhatsApp · reply within 24 hours
About the Manchester
Manchester is a low, enveloping tub chair with stitched panels across the back, shown in a vintage-look taupe fabric.
Manchester packs two per carton and loads 540 pieces per 40HQ container.
Highlights
- Low enveloping tub shape
- Stitched back panels
- Four-star steel base
- 540 pcs per 40HQ, 2 pcs per carton
Specifications
- Model
- Manchester
- Overall size (W × D × H)
- 62 × 63 × 84 cm
- Shown in
- Taupe vintage-look fabric, black steel base
- Packing
- 2 pcs per carton
- Loading per 40HQ
- 540 pcs
Made to order
Your fabric, your finish, your label.
Fabric & colour
Velvets, chenilles, linens, technical fabrics, genuine leather and PU leather from our library — or send your own roll.
Base & finish
Powder-coat colour and finish on steel bases; wooden bases where the design allows.
Seat & stitching
Seat build, piping, stitch pattern and contrast details are adjusted at sampling stage.
Packaging & labels
Your carton artwork, shipping marks and barcode labels, with a pre-production carton sample for approval.
Order terms
- Minimum order
- 100 pcs per model, colours mixed
- Small batches
- Olleo Flex: from 4–6 pcs, about 15 days
- Production
- 35 days from deposit and approvals
- New samples
- 2–4 weeks
- Trade terms
- FOB Ningbo / Shanghai; EXW, CFR, CIF on request
- Standards
- Engineered against EN 12520; EN 16139 reviewed for contract projects
- Quotation
- Within 24 hours
Manchester: questions & answers
What is the minimum order for the Manchester Dining Chair?
The minimum order is 100 pieces of the Manchester, and colours and fabrics can be mixed within that quantity. To test the model first, Olleo Flex produces from 4–6 pieces in about 15 days.
How many Manchester dining chairs fit into a 40HQ container?
540 pieces of the Manchester load into one 40HQ container, packed 2 per carton. Different models can be combined in one container.
Can the Manchester be made in a different fabric or colour?
Yes. The Manchester is made to order: choose a fabric from the Olleo library, or send your own. Base finish and packaging can also be specified.
How long is the lead time for the Manchester?
Production takes 35 days from deposit and final approvals. Goods ship FOB Ningbo or Shanghai; EXW, CFR, CIF terms are also available.
You may also like
All dining chairsRequest a quote
Price, samples and loading plan for the Manchester.
Tell us your quantity and destination port. We reply within 24 hours with pricing, carton sizes and a production schedule.
Thank you — your enquiry is with our export team.
You will hear from us within 24 hours with pricing, carton sizes and a production schedule. For anything urgent, message us on WhatsApp.