Dining Chairs · Current collection

Manchester Dining Chair

Low-back tub chair with stitched panels.

  • With armrests
Size (W × D × H)
62 × 63 × 84 cm
Packing
2 per carton · 540 pcs per 40HQ
Minimum order
100 pcs, colours can be mixed
Lead time
35 days production
Shown in
Taupe vintage-look fabric, black steel base
Request price & samples

About the Manchester

Manchester is a low, enveloping tub chair with stitched panels across the back, shown in a vintage-look taupe fabric.

Manchester packs two per carton and loads 540 pieces per 40HQ container.

Highlights

  • Low enveloping tub shape
  • Stitched back panels
  • Four-star steel base
  • 540 pcs per 40HQ, 2 pcs per carton

Specifications

Model
Manchester
Overall size (W × D × H)
62 × 63 × 84 cm
Shown in
Taupe vintage-look fabric, black steel base
Packing
2 pcs per carton
Loading per 40HQ
540 pcs

Made to order

Your fabric, your finish, your label.

  • Fabric & colour

    Velvets, chenilles, linens, technical fabrics, genuine leather and PU leather from our library — or send your own roll.

  • Base & finish

    Powder-coat colour and finish on steel bases; wooden bases where the design allows.

  • Seat & stitching

    Seat build, piping, stitch pattern and contrast details are adjusted at sampling stage.

  • Packaging & labels

    Your carton artwork, shipping marks and barcode labels, with a pre-production carton sample for approval.

Order terms

Minimum order
100 pcs per model, colours mixed
Small batches
Olleo Flex: from 4–6 pcs, about 15 days
Production
35 days from deposit and approvals
New samples
2–4 weeks
Trade terms
FOB Ningbo / Shanghai; EXW, CFR, CIF on request
Standards
Engineered against EN 12520; EN 16139 reviewed for contract projects
Quotation
Within 24 hours

How OEM / ODM works

Manchester: questions & answers

What is the minimum order for the Manchester Dining Chair?

The minimum order is 100 pieces of the Manchester, and colours and fabrics can be mixed within that quantity. To test the model first, Olleo Flex produces from 4–6 pieces in about 15 days.

How many Manchester dining chairs fit into a 40HQ container?

540 pieces of the Manchester load into one 40HQ container, packed 2 per carton. Different models can be combined in one container.

Can the Manchester be made in a different fabric or colour?

Yes. The Manchester is made to order: choose a fabric from the Olleo library, or send your own. Base finish and packaging can also be specified.

How long is the lead time for the Manchester?

Production takes 35 days from deposit and final approvals. Goods ship FOB Ningbo or Shanghai; EXW, CFR, CIF terms are also available.

Request a quote

Price, samples and loading plan for the Manchester.

Tell us your quantity and destination port. We reply within 24 hours with pricing, carton sizes and a production schedule.

Reply within 24 hours

WhatsApp