Bar Stools · Classic range
Dagnar Metal Stool
Backless metal stool with a round seat on a four-leg frame joined by floor rails.
- Metal range
- Size (W × D × H)
- 42 × 39 × 66 cm
- Packing
- 2 per carton · 960 pcs per 40HQ
- Minimum order
- 100 pcs, colours can be mixed
- Lead time
- 35 days production
- Shown in
- Black powder-coated frame, elm-wood seat
Ask about this model on WhatsApp · reply within 24 hours
About the Dagnar
Dagnar is a backless metal stool with a round seat on a four-leg frame joined by floor rails. Frame: iron tube with 1.0 mm wall, powder coated. Shown here: black powder-coated frame, elm-wood seat.
Overall size is 42 × 39 × 66 cm (W × D × H). It packs 2 per carton (44 × 41 × 78 cm, 6.9 / 8.4 kg net / gross, 0.141 m³) and 960 pieces load into one 40HQ container. Other finishes are available to order.
Highlights
- Elm-wood seat, 32 cm diameter
- Iron tube with 1.0 mm wall, powder coated
- 960 pcs per 40HQ, 2 pcs per carton
Specifications
- Model
- Dagnar
- Overall size (W × D × H)
- 42 × 39 × 66 cm
- Seat construction
- Elm-wood seat, 32 cm diameter
- Frame / base
- Iron tube with 1.0 mm wall, powder coated
- Shown in
- Black powder-coated frame, elm-wood seat
- Packing
- 2 pcs per carton
- Carton size
- 44 × 41 × 78 cm
- Net / gross weight per carton
- 6.9 / 8.4 kg
- Volume per carton
- 0.141 m³
- Loading per 40HQ
- 960 pcs
Made to order
Your fabric, your finish, your label.
Fabric & colour
Velvets, chenilles, linens, technical fabrics, genuine leather and PU leather from our library — or send your own roll.
Base & finish
Powder-coat colour and finish on steel bases; wooden bases where the design allows.
Seat & stitching
Seat build, piping, stitch pattern and contrast details are adjusted at sampling stage.
Packaging & labels
Your carton artwork, shipping marks and barcode labels, with a pre-production carton sample for approval.
Order terms
- Minimum order
- 100 pcs per model, colours mixed
- Small batches
- Olleo Flex: from 4–6 pcs, about 15 days
- Production
- 35 days from deposit and approvals
- New samples
- 2–4 weeks
- Trade terms
- FOB Ningbo / Shanghai; EXW, CFR, CIF on request
- Standards
- Engineered against EN 12520; EN 16139 reviewed for contract projects
- Quotation
- Within 24 hours
Dagnar: questions & answers
What is the minimum order for the Dagnar Metal Stool?
The minimum order is 100 pieces of the Dagnar, and colours and fabrics can be mixed within that quantity. To test the model first, Olleo Flex produces from 4–6 pieces in about 15 days.
How many Dagnar bar stools fit into a 40HQ container?
960 pieces of the Dagnar load into one 40HQ container, packed 2 per carton. Different models can be combined in one container.
Can the Dagnar be made in a different fabric or colour?
Yes. The Dagnar is made to order: choose a fabric from the Olleo library, or send your own. Base finish and packaging can also be specified.
How long is the lead time for the Dagnar?
Production takes 35 days from deposit and final approvals. Goods ship FOB Ningbo or Shanghai; EXW, CFR, CIF terms are also available.
Request a quote
Price, samples and loading plan for the Dagnar.
Tell us your quantity and destination port. We reply within 24 hours with pricing, carton sizes and a production schedule.
Thank you — your enquiry is with our export team.
You will hear from us within 24 hours with pricing, carton sizes and a production schedule. For anything urgent, message us on WhatsApp.